Business_Finbiz
Project Information
Clients:
90 Avenue
Category:
Waterproof systems
Date:
2024-04-14
Address:
5th Settlment
Project Details

90 Avenue Project

🚧 Proudly embarking on the "90 Avenue" project, Tadmur Egypt, in collaboration with TBK Constructions, undertakes the task of constructing and rehabilitating bathrooms using state-of-the-art cement insulation techniques.
🏗️ The implementation stages include:
Thorough cleaning of the bathrooms to ensure optimal performance.
Making a cement collar with dimensions of 5cm × 5cm.
Preparation of necessary fittings before the cement painting process using repair mortar.
Supply and installation of two layers of cement insulation to protect against leaks.
Conducting water tests to verify the absence of leaks.
Applying an additional protective layer to the cement insulation before plumbing works are installed.
🏢 We strive to achieve the highest standards of quality and professionalism in every stage of the project. Stay tuned for more updates!

The Challenge and Solutions Of the Project

Ensuring Structural Integrity During Insulation: Employing advanced techniques to reinforce structural integrity while applying insulation materials.

Addressing Environmental Concerns: Utilizing eco-friendly materials and methods to minimize environmental impact and promote sustainability.

Managing Project Timelines Efficiently: Implementing a detailed project management plan to ensure timely completion without compromising quality.

Dealing with Existing Water Leaks: Identifying and repairing existing leaks to prevent further damage and ensure a solid foundation for new insulation.

Adhering to Technical Specifications: Strictly following technical specifications to ensure compliance with industry standards of the project.

Providing Long-Lasting Solutions: Developing and applying durable insulation solutions that withstand the test of time and weather conditions.